Close

PMKSY – WDC 2.0, SIAHA

Date : 01/01/2024 - 01/12/2028 | Sector: PMKSY – WDC 2.0, SIAHA

ACHIEVEMENT REPORT  ; PMKSY – WDC 2.0, SIAHA

NAME OF PROJECT  – Saiha-l/WDC-PMKSY/2021-2022

NAME OF PIA  – Project Director, DRDO SIAHA

AREA – 2500 Ha

PROJECT COST – 700 Lakh

VILLAGE COVERED  – Chakhang-I, Chakhang-II and Chakhang- III (Chakheitla)

Objective:

  • Improve productive potential of Rain-fed/Degraded land and development of springs and ground-water through integrated watershed management.
  • Enhancing economic growth of the village community dependent on the watershed/spring shed.
  • Ecological restoration and sustainable management of natural resources across the project area.
  • Improving the economic and social conditions of the resource poor, asset-less, differently-abled and women.

 COMPONENTS

1. NRM (47%) of the total Fund:

2. Soil & Moisture Conservation

Agronomic and engineering methods to prevent Soil erosion and improve soil moisture availability.

e.g. WRC, Check-Dam, Terrace, Trenching and Gabion Structure etc.

  1. Water Harvesting Structure:

Capture, diversion and storage of water obtain from different water sources for irrigation, domestic, ground-water recharge and other uses.

e.g. WHS (Community and Individual), Farm Pond, Water Reservoir, Gravitational water pipe-lines etc.

  1. Horticulture:

Techniques of production, processing, merchandising of fruit and vegetables etc. (Banana, Ginger and bitter beans had been cultivated in the Project area.      

  1. Livelihood & Micro-enterprise (15%):

To support the landless/ assetless poor, marginalized communities and women, etc, with sustainable livelihoods opportunities for their social-economic development and to improve household income, access to information, knowledge, appropriate technologies and resources leading to their empowerment as a group or individually.

  1. Production System (15%):

To support and furnish the above component for better production and productivity.

Such as:

  • Horticulture: Knapsack Sprayer, Plastic crates, Digital weighing-scale etc.
  • Soil & Moisture Conservation: Kisan Agri Pipe (HDPE).
  • Water Harvesting Structure: GI Pipe.
  • Livelihood & Micro-enterprise: Fish Feed (Pelleted), Fish Seed, Himalyan Rock Salt (Cattle Lick), Poultry Feed, Pig Feed and Cattle Guard, etc.

 FINANCIAL YEAR 2023-2024

 Fund received:

Financial Year

CS

SMS

2023-2024

1st Tranche

NRM

24.5070

2.7230

Production System

1.8900

0.2100

TOTAL

26.397

2.933

G. TOTAL (CS+SMS)

29.33

 

Expenditure:

2023-2024

1st Tranche

NRM

No. of Works

Amount (Rs)

Bench Terracing

11

4.8664

Check Dam

2

2.6992

Water Reservoir

1

3.9816

Renovation of Fish Pond

5

2.212

Renovation of Water Reservoir

2

1.7696

Irrigation Channel

2

2.212

Rain Water Harvesting Cum Waiting Shed

2

6.1936

Gravity Pipeline

1

0.8848

Intake Chamber

2

0.4424

WHS Individual

4

1.7696

PRODUCTION SYSTEM

 

 

Agri Pipe (500m)

12.5nos

1.875

TOTAL

 

28.9062

 ***Remaining balance 0.4238 is for Security.

 

Financial Year

CS

SMS

2023-2024

2nd Tranche

NRM

29.0430

3.2270

Livelihood & Microenterprise

10.4580

1.1620

TOTAL

39.501

4.389

G. TOTAL(CS+SMS)

43.89

 

2023-2024

2nd Tranche

NRM

No. of Works

Amount (Rs)

Bench Terracing

1

0.4424

Check Dam

4

4.8664

Water Reservoir

1

3.318

Renovation of Fish Pond

9

3.9816

Renovation of Water Reservoir

3

3.09684

Intake Chamber

13

2.8756

WHS Individual

14

5.7512

Gabion Structure

2

0.8848

Horticulture

 

 

Weeding and soil management for Banana

36nos

0.72

Ginger Cultivation

36nos

5.04

Field preparation for Ginger

36nos

1.08

Livelihood and Microenterprise

 

 

SHG

7nos

1.75

2nd instalment Micro

42nos

6.3S

New Micro

13nos

3.45

TOTAL

47nos

43.89

 

Financial Year

CS

SMS

2023-2024

3rd Tranche

NRM

27.72

3.08

Livelihood & Microenterprise

6.93

0.77

Production System

6.3

0.7

TOTAL

40.95

4.55

G. TOTAL (CS+SMS)

45.5

  

2023-2024

3rd Tranche

NRM

No. of Works

Amount (Rs)

Check Dam

5

6.636

Water Reservoir (New Cons)

3

9.954

Water Reservoir (Reno)

1

1.106

Renovation of Fish Pond

7

3.7604

Compost Pit

2

0.4424

Intake Chamber

9

1.9908

WHS Individual

8

3.5392

Gabion Structure

1

0.7742

Farm Pond

4

0.8848

Irrigation Channel

1

1.3272

Livelihood and Microenterprise

 

 

Micro-Enterprises

26nos

7.5

Production System

 

 

Knapsack Sprayer

60nos

0.9

Digital Weighing Scale

6nos

0.48

Agri Pipe (25mm)

12nos

1.8

Poultry Feed

45bags

1.35

Cattle Guard

1

0.84

Pig Feed

45bags

1.35

Fish Feed

14bags

0.28

TOTAL AMOUNT

 

44.915

*** Remaining Rs. 0.585 is for security

 

Financial Year

CS

SMS

2023-2024

4th Tranche

NRM

7.938

0.882

Livelihood & Microenterprise

8.379

0.931

Production System

6.3

0.7

TOTAL

22.617

2.513

G. TOTAL (CS+SMS)

25.13

 

2023-2024

4th Tranche

NRM

No. of Works

Amount (Rs)

Plantation (Afforestation)

3

1.9908

Bench Terracing

1

0.4424

Staggered Trench

3

0.6636

WHS Individual

2

0.8848

Gabion Structure

5

2.1476

Farm Pond

4

2.6544

Livelihood and Microenterprise

 

 

SHG

4nos

1.0

Micro

28nos

7.95

Production System

 

 

Himalaya rock salt animal lick

150kg

0.675

Cattle Guard

1

0.727

Fish seed

36beneficiaries

3.6

Fish Feed

58bags

1.998

TOTAL AMOUNT

 

24.7336

 *** Remaining Rs. 0.3964 is for security

Beneficiary:

Citizen residing in the Boarder block

Benefits:

Citizen residing in the Boarder block

How To Apply

Contact DRDO Department, Siaha District, Siaha

View (8 MB)