PMKSY – WDC 2.0, SIAHA
ACHIEVEMENT REPORT ; PMKSY – WDC 2.0, SIAHA
NAME OF PROJECT – Saiha-l/WDC-PMKSY/2021-2022
NAME OF PIA – Project Director, DRDO SIAHA
AREA – 2500 Ha
PROJECT COST – 700 Lakh
VILLAGE COVERED – Chakhang-I, Chakhang-II and Chakhang- III (Chakheitla)
Objective:
- Improve productive potential of Rain-fed/Degraded land and development of springs and ground-water through integrated watershed management.
- Enhancing economic growth of the village community dependent on the watershed/spring shed.
- Ecological restoration and sustainable management of natural resources across the project area.
- Improving the economic and social conditions of the resource poor, asset-less, differently-abled and women.
COMPONENTS
1. NRM (47%) of the total Fund:
2. Soil & Moisture Conservation
Agronomic and engineering methods to prevent Soil erosion and improve soil moisture availability.
e.g. WRC, Check-Dam, Terrace, Trenching and Gabion Structure etc.
- Water Harvesting Structure:
Capture, diversion and storage of water obtain from different water sources for irrigation, domestic, ground-water recharge and other uses.
e.g. WHS (Community and Individual), Farm Pond, Water Reservoir, Gravitational water pipe-lines etc.
- Horticulture:
Techniques of production, processing, merchandising of fruit and vegetables etc. (Banana, Ginger and bitter beans had been cultivated in the Project area.
- Livelihood & Micro-enterprise (15%):
To support the landless/ assetless poor, marginalized communities and women, etc, with sustainable livelihoods opportunities for their social-economic development and to improve household income, access to information, knowledge, appropriate technologies and resources leading to their empowerment as a group or individually.
- Production System (15%):
To support and furnish the above component for better production and productivity.
Such as:
- Horticulture: Knapsack Sprayer, Plastic crates, Digital weighing-scale etc.
- Soil & Moisture Conservation: Kisan Agri Pipe (HDPE).
- Water Harvesting Structure: GI Pipe.
- Livelihood & Micro-enterprise: Fish Feed (Pelleted), Fish Seed, Himalyan Rock Salt (Cattle Lick), Poultry Feed, Pig Feed and Cattle Guard, etc.
FINANCIAL YEAR 2023-2024
Fund received:
Financial Year |
CS |
SMS |
2023-2024 |
1st Tranche |
|
NRM |
24.5070 |
2.7230 |
Production System |
1.8900 |
0.2100 |
TOTAL |
26.397 |
2.933 |
G. TOTAL (CS+SMS) |
29.33 |
Expenditure:
2023-2024 |
1st Tranche |
|
NRM |
No. of Works |
Amount (Rs) |
Bench Terracing |
11 |
4.8664 |
Check Dam |
2 |
2.6992 |
Water Reservoir |
1 |
3.9816 |
Renovation of Fish Pond |
5 |
2.212 |
Renovation of Water Reservoir |
2 |
1.7696 |
Irrigation Channel |
2 |
2.212 |
Rain Water Harvesting Cum Waiting Shed |
2 |
6.1936 |
Gravity Pipeline |
1 |
0.8848 |
Intake Chamber |
2 |
0.4424 |
WHS Individual |
4 |
1.7696 |
PRODUCTION SYSTEM |
|
|
Agri Pipe (500m) |
12.5nos |
1.875 |
TOTAL |
|
28.9062 |
***Remaining balance 0.4238 is for Security.
Financial Year |
CS |
SMS |
2023-2024 |
2nd Tranche |
|
NRM |
29.0430 |
3.2270 |
Livelihood & Microenterprise |
10.4580 |
1.1620 |
TOTAL |
39.501 |
4.389 |
G. TOTAL(CS+SMS) |
43.89 |
2023-2024 |
2nd Tranche |
|
NRM |
No. of Works |
Amount (Rs) |
Bench Terracing |
1 |
0.4424 |
Check Dam |
4 |
4.8664 |
Water Reservoir |
1 |
3.318 |
Renovation of Fish Pond |
9 |
3.9816 |
Renovation of Water Reservoir |
3 |
3.09684 |
Intake Chamber |
13 |
2.8756 |
WHS Individual |
14 |
5.7512 |
Gabion Structure |
2 |
0.8848 |
Horticulture |
|
|
Weeding and soil management for Banana |
36nos |
0.72 |
Ginger Cultivation |
36nos |
5.04 |
Field preparation for Ginger |
36nos |
1.08 |
Livelihood and Microenterprise |
|
|
SHG |
7nos |
1.75 |
2nd instalment Micro |
42nos |
6.3S |
New Micro |
13nos |
3.45 |
TOTAL |
47nos |
43.89 |
Financial Year |
CS |
SMS |
2023-2024 |
3rd Tranche |
|
NRM |
27.72 |
3.08 |
Livelihood & Microenterprise |
6.93 |
0.77 |
Production System |
6.3 |
0.7 |
TOTAL |
40.95 |
4.55 |
G. TOTAL (CS+SMS) |
45.5 |
2023-2024 |
3rd Tranche |
|
NRM |
No. of Works |
Amount (Rs) |
Check Dam |
5 |
6.636 |
Water Reservoir (New Cons) |
3 |
9.954 |
Water Reservoir (Reno) |
1 |
1.106 |
Renovation of Fish Pond |
7 |
3.7604 |
Compost Pit |
2 |
0.4424 |
Intake Chamber |
9 |
1.9908 |
WHS Individual |
8 |
3.5392 |
Gabion Structure |
1 |
0.7742 |
Farm Pond |
4 |
0.8848 |
Irrigation Channel |
1 |
1.3272 |
Livelihood and Microenterprise |
|
|
Micro-Enterprises |
26nos |
7.5 |
Production System |
|
|
Knapsack Sprayer |
60nos |
0.9 |
Digital Weighing Scale |
6nos |
0.48 |
Agri Pipe (25mm) |
12nos |
1.8 |
Poultry Feed |
45bags |
1.35 |
Cattle Guard |
1 |
0.84 |
Pig Feed |
45bags |
1.35 |
Fish Feed |
14bags |
0.28 |
TOTAL AMOUNT |
|
44.915 |
*** Remaining Rs. 0.585 is for security
Financial Year |
CS |
SMS |
2023-2024 |
4th Tranche |
|
NRM |
7.938 |
0.882 |
Livelihood & Microenterprise |
8.379 |
0.931 |
Production System |
6.3 |
0.7 |
TOTAL |
22.617 |
2.513 |
G. TOTAL (CS+SMS) |
25.13 |
2023-2024 |
4th Tranche |
|
NRM |
No. of Works |
Amount (Rs) |
Plantation (Afforestation) |
3 |
1.9908 |
Bench Terracing |
1 |
0.4424 |
Staggered Trench |
3 |
0.6636 |
WHS Individual |
2 |
0.8848 |
Gabion Structure |
5 |
2.1476 |
Farm Pond |
4 |
2.6544 |
Livelihood and Microenterprise |
|
|
SHG |
4nos |
1.0 |
Micro |
28nos |
7.95 |
Production System |
|
|
Himalaya rock salt animal lick |
150kg |
0.675 |
Cattle Guard |
1 |
0.727 |
Fish seed |
36beneficiaries |
3.6 |
Fish Feed |
58bags |
1.998 |
TOTAL AMOUNT |
|
24.7336 |
*** Remaining Rs. 0.3964 is for security
Beneficiary:
Citizen residing in the Boarder block
Benefits:
Citizen residing in the Boarder block